Project Name | Location/Province | Contract # | Start/Finish | Description of work and extent of responsibility | Contract Value | Client |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Car park upgrade and fencing | Morobe Province | Profoma | September 2019-January 2020 | MPG car park upgrade and fencing | K2, 497,224 | Dept of Works-TSSP |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Pavement and resealing (Profoma works) 8.6Km | Markham, Morobe Province | Varied Numbers | April 2017 to November 2017 | Pavement repair and resealing Mutzing section of Highlands Highway (Km8.6) | K1, 955, 667.91 | GoPNG-Department of Works-TSSP |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Pavement and sealing works between Mupu Bridge and Biribiri mountain along Ramu Highway in Madang Province, (7km). | Ramu, Madang Province | 34-AT-24BR | January 2014 to May 2015 | Minor pavement repairs, executive isolated pothole patching and 14mm reseal between Gogol Bridge to Tapo Ford (14km). 19 & 14mm 2 coat seal between Mupu Bridge and Biribiri Mountain (7.6km). Construction of line drains type (4-6) and installation of Gabion baskets and culverts. River training and protection works. Erection of road furniture and pavement line marking. | 8.2 million | TSSP AusAid |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Pavement upgrading and sealing of Angau Memorial Hospital car park and drive ways. | Lae, Morobe Province | PSTB-COI/MWC/MPNI4201/10/2014 | January 2014 to May 2015 | 19 & 14mm two coat sealing of Angau Memorial Hospital car parks and driveways (1.3km) | K4.7 million | Independent State of Papua New Guinea (GoPNG) |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Major maintenance of sections of Aseki/Menyemya road in Morobe Province. (87km) | Lae, Morobe Province | Contract No. PSTB COI/MASEKI/LAE/42-07/2013 | 2013 to 2015 (18 months) | Major earthworks including spot gravelling with approved material, placement of geo fabric and removal of land slips. Drainage structures including supply & install new culverts and supply & place subsoil drains. Road furniture including guard rails & fillings. Protection works including installing gabion baskets, land slip protection and retaining walls. | K13.1 million | Independent State of Papua New Guinea (GoPNG) |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Upgrading and sealing of Wau Highway between Bulolo end of seal and Pinetop bridge in Morobe Province. | Lae, Morobe Province | Contract No. 31-AT-24BJ | 2013 to 2014 (8 months) | 19 & 14mm 2 coat seal between Bulolo town and Pinetop Bridge (7.3km). Specific earthworks including excavation/backfilling and benching. Construction of type 4 open line drains, replacement of existing culverts. Erection of road furniture and pavement line marking. | PGK 6 Million (plus variations) | Independent State of Papua New Guinea and fully funded by AusAid (TSSP) |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Upgrade and sealing of Unitech (The University of Technology) campus roads. | Lae, Morobe Province | Contract No. PSTB COI-MP-/03/2013 | 2013 to June 2014 (12 months)
| 19 & 14mm 2 coat sealing of various road sections (9.5km). Construction and repairing of kerbing channels, clean existing manholes and gully pits, and replace damaged culverts with RCP culverts. | PGK 9.2 Million | Independent State of Papua New Guinea (GoPNG) |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Madang Town roads pavement and rehabilitation works. | Madang Province | Contract No. PSTB MTRRW DOW-03/2012 (Stage 1 & 2) | 2013 to 2014 (8 months) | 19 & 14mm 2 coat sealing of various road sections in Madang Town. Construction and repairing of kerbing channels, clean existing manholes and gully pits, and replace damaged culverts with RCP culverts. | K6 million | Independent State of Papua New Guinea (GoPNG) |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Re-gravelling of Pilipili Ailan junction to Kumbame Junction in SHP. (Phase 1 & 2) | Ialibu, SHP | Contract No. COI/KUMBAME ROAD/03/2012 | 2012 to 2013 (8 months) | Including spot gravelling with approved material, placement of geo fabric and removal of land slips. Drainage structures including supply & install new culverts and supply & place subsoil drains. Road furniture including guard rails & fillings Protection works including installing gabion baskets, land slip protection and retaining walls. | K6 million | Independent State of Papua New Guinea (GoPNG) |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Section 2B, Lae City roads rehabilitation of Huon Road from Bumbu junction to Milford Haven junction. | Lae City, Morobe Province | Contract No: CSTB 2215 | 2011 to 2012 (8 months) | Construction of 250mm thick 40MPA concrete pavement of 0.6km Eriku road section in Lae City. Construction and repairing of Kerbing channels, medians, clean existing manholes and gully pits, and replace damaged culverts with RCP culverts. Erection of road furniture and pavement line marking. | K6 million | Independent State of Papua New Guinea and fully funded by GoPNG |
_________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Upgrade and rehabilitation of Lae City roads – stage 2. Highlands Highway from intersection of Boundary Road to Milford Haven junction. (1.8km) | Lae City, Morobe Province | CONTRACT No: COI 074/10 | 2011 to 2012 (12 months) | Construction of 250mm thick 40MPA concrete pavement of 1.8km road section in Lae City. Construction and repairing of Kerbing channels, medians, clean existing manholes and gully pits, and replace damaged culverts with RCP culverts. Erection of road furniture and pavement line marking. | K9 million | Independent State of Papua New Guinea and fully funded by GoPNG |
__________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||
Upgrading and sealing of Transgogol Highway from 4 mile to Bau Vocational School in Madang Province. (19km) –Phase1 | Madang Province | Contract No. SC32-AT-23AA CSTB No. 1949B | 2010 to 2012 (18 months) | 19 &14mm 2 coat seal of 19 km road section of Transgogol Highway. Major earthworks including spot gravelling with approved material, placement of geo fabric and removal of land slips. Drainage structures including supply & install new culverts and supply & place subsoil drains. Road furniture including guard rails & fillings. Protection works including installing gabion baskets, land slip protection and retaining walls. | K13 million | Independent State of Papua New Guinea (GoPNG) Department of Works (Madang) |
___________________________________________________________________________________________________________________________________________________________________________________________________________________________ | ||||||