COMPLETED PROJECTS

Project Name

Location/Province

Contract #

Start/Finish

Description of work and extent of responsibility

Contract Value

Client

__________________________________________________________________________________________________________________________________________________________________________________________________________________________

Car park upgrade and fencing

Morobe Province Profoma
September 2019-January 2020
MPG car park upgrade and fencing

 K2, 497,224

Dept of Works-TSSP
__________________________________________________________________________________________________________________________________________________________________________________________________________________________
 Pavement and resealing (Profoma works) 8.6Km  Markham, Morobe Province  Varied Numbers  April 2017 to November 2017  Pavement repair and resealing Mutzing section of Highlands Highway (Km8.6) K1, 955, 667.91 GoPNG-Department of Works-TSSP
__________________________________________________________________________________________________________________________________________________________________________________________________________________________
Pavement and sealing works between Mupu Bridge and Biribiri mountain along Ramu Highway in Madang Province, (7km). Ramu, Madang Province 34-AT-24BR

January 2014 to May 2015

Minor pavement repairs, executive isolated pothole patching and 14mm reseal between Gogol Bridge to Tapo Ford (14km).

19 & 14mm 2 coat seal between Mupu Bridge and Biribiri Mountain (7.6km).

Construction of line drains type (4-6) and installation of Gabion baskets and culverts.

River training and protection works.

Erection of road furniture and pavement line marking.

8.2 million TSSP AusAid
__________________________________________________________________________________________________________________________________________________________________________________________________________________________
Pavement upgrading and sealing of Angau Memorial Hospital car park and drive ways. Lae, Morobe Province

PSTB-COI/MWC/MPNI4201/10/2014

January 2014 to May 2015

19 & 14mm two coat sealing of Angau Memorial Hospital car parks and driveways (1.3km)   Construction of Kerbing channels, spoon drains and replace damaged culverts with RCP culverts. Erection of road furniture and pavement line marking.

 K4.7 million  Independent State of Papua New Guinea (GoPNG)
 __________________________________________________________________________________________________________________________________________________________________________________________________________________________
Major maintenance of sections of Aseki/Menyemya road in Morobe Province. (87km) Lae, Morobe Province Contract No. PSTB COI/MASEKI/LAE/42-07/2013  

2013 to 2015

(18 months) 

Major earthworks including spot gravelling with approved material, placement of geo fabric and removal of land slips.

Drainage structures including supply & install new culverts and supply & place subsoil drains.

Road furniture including guard rails & fillings. 

Protection works including installing gabion baskets, land slip protection and retaining walls.

 K13.1 million Independent State of Papua New Guinea (GoPNG)
__________________________________________________________________________________________________________________________________________________________________________________________________________________________

Upgrading and sealing of Wau Highway between Bulolo end of seal and Pinetop bridge in Morobe Province.

 Lae, Morobe Province  

Contract No. 31-AT-24BJ

 

2013 to 2014

(8 months) 
19 & 14mm 2 coat seal between Bulolo town and Pinetop Bridge (7.3km).

Specific earthworks including excavation/backfilling and benching.

Construction of type 4 open line drains, replacement of existing culverts.

Erection of road furniture and pavement line marking.

 

PGK 6 Million

(plus variations) 
 

Independent State of Papua New Guinea and fully funded by AusAid (TSSP)

__________________________________________________________________________________________________________________________________________________________________________________________________________________________
Upgrade and sealing of Unitech (The University of Technology) campus roads.  Lae, Morobe Province  

Contract No. PSTB COI-MP-/03/2013

 

2013 to June 2014

(12 months)

 

19 & 14mm 2 coat sealing of various road sections (9.5km).

Construction and repairing of kerbing channels, clean existing manholes and gully pits, and replace damaged culverts with RCP culverts.

 

PGK 9.2 Million

 

Independent State of Papua New Guinea (GoPNG)

__________________________________________________________________________________________________________________________________________________________________________________________________________________________
 

Madang Town roads pavement and rehabilitation works.

 Madang Province   

Contract No. PSTB MTRRW DOW-03/2012 (Stage 1 & 2)

 

2013 to 2014

(8 months)
 19 & 14mm 2 coat sealing of various road sections in Madang Town.

Construction and repairing of kerbing channels, clean existing manholes and gully pits, and replace damaged culverts with RCP culverts.

 

K6 million

 

Independent State of Papua New Guinea (GoPNG)

__________________________________________________________________________________________________________________________________________________________________________________________________________________________
 

Re-gravelling of Pilipili Ailan junction to Kumbame Junction in SHP. (Phase 1 & 2)

 Ialibu, SHP

Contract No. COI/KUMBAME ROAD/03/2012

 

2012 to 2013

(8 months) 
 Including spot gravelling with approved material, placement of geo fabric and removal of land slips.

 Drainage structures including supply & install new culverts and supply & place subsoil drains.

Road furniture including guard rails & fillings

 Protection works including installing gabion baskets, land slip protection and retaining walls.

 

K6 million

 

Independent State of Papua New Guinea (GoPNG)

__________________________________________________________________________________________________________________________________________________________________________________________________________________________

Section 2B, Lae City roads rehabilitation of Huon Road from Bumbu junction to Milford Haven junction.

Lae City, Morobe Province

Contract No: CSTB 2215

2011 to 2012

(8 months)

Construction of 250mm thick 40MPA concrete pavement of 0.6km Eriku road section in Lae City.

Construction and repairing of Kerbing channels, medians, clean existing manholes and gully pits, and replace damaged culverts with RCP culverts.

Erection of road furniture and pavement line marking.

K6 million

Independent State of Papua New Guinea and fully funded by GoPNG

_________________________________________________________________________________________________________________________________________________________________________________________________________________________

Upgrade and rehabilitation of Lae City roads – stage 2. Highlands Highway from intersection of Boundary Road to Milford Haven junction. (1.8km)

Lae City, Morobe Province

CONTRACT No: COI 074/10

 

2011 to 2012

(12 months)
Construction of 250mm thick 40MPA concrete pavement of 1.8km road section in Lae City.

Construction and repairing of Kerbing channels, medians, clean existing manholes and gully pits, and replace damaged culverts with RCP culverts.

Erection of road furniture and pavement line marking.

 

K9 million

 

Independent State of Papua New Guinea and fully funded by GoPNG

__________________________________________________________________________________________________________________________________________________________________________________________________________________________

Upgrading and sealing of Transgogol Highway from 4 mile to Bau Vocational School in Madang Province. (19km) –Phase1

 Madang Province   

Contract No. SC32-AT-23AA

CSTB No. 1949B 
 

2010 to 2012

(18 months)

19 &14mm 2 coat seal of 19 km road section of Transgogol Highway.

Major earthworks including spot gravelling with approved material, placement of geo fabric and removal of land slips.

Drainage structures including supply & install new culverts and supply & place subsoil drains. 

Road furniture including guard rails & fillings.

Protection works including installing gabion baskets, land slip protection and retaining walls.

 

K13 million

 

Independent State of Papua New Guinea (GoPNG)

Department of Works (Madang) 
___________________________________________________________________________________________________________________________________________________________________________________________________________________________